Queens Quay Opens on Time After Three Years of Revitalization Work

06/2015 | Newsletter | West 8 Urban Design & Landscape Architecture

On Friday the 19th of June, after three years of construction, Toronto’s revitalized waterfront boulevard designed by West 8 together with DTAH was officially opened – on schedule, and in time for the Redpath Waterfront Festival and the upcoming Pan Am and Parapan Am Games.

New promenades and benches, cycling pathways and other infrastructure were celebrated shortly after 6:00 p.m., when hundreds of local volunteers stretched a 650-metre blue ribbon from York Street to HTO Park for the official Ribbon Cutting Ceremony. The West 8 design team and directors participated in the opening at Simcoe Wavedeck.

John Tory, Mayor of Toronto described the new Queens Quay as ''the waterfront gateway that Toronto rightly deserves. From a tree-lined biking trail, to the dedicated streetcar lanes and pedestrian promenades, the boulevard is a destination Torontonians can take pride in.” 

Once a street that featured poor design, insufficient room for pedestrians, and ageing infrastructure, Queens Quay has been transformed into a beautiful boulevard that includes a separated TTC right-of-way, a new section of the Martin Goodman Trail that connects the Trail across the downtown waterfront, and an enlarged pedestrian promenade that reflects the central waterfront’s importance as the second most-visited area of the city. Under the street, key infrastructure has been replaced or upgraded, including power, gas, water, sewage and telecommunications systems.

West 8 and DTAH's design for the new Queens Quay was developed after an international design competition and extensive environmental assessment process that were aimed at enhancing the area’s appeal as Toronto’s prime waterfront destination. Years of public consultation resulted in a design that not only improved the street’s condition, but directly reflected the needs and dreams of those who live, work and play here.

The new 1.7km long Queens Quay features improved facilities for:

- Pedestrians: A wide, red granite pedestrian promenade, comfortable benches and healthy trees planted using Silva Cells – all of which stitch the area together
- Cyclists: A separated bike path that provides the missing connection of the Martin Goodman Trail and that features dedicated bicycle signals
- Transit users: A new dedicated light rail right-of-way with new, fully accessible platforms, shelters and a prioritized signal system
- Motorists: Dedicated turning lanes and signals, lay-bys for car and bus passenger drop-offs
- Waterfront retailers and restaurants: New north-side sidewalks and landscaping that extend to the edge of storefronts and will stimulate ground floor retail activity and urban vitality

This new street will link major destinations along the water’s edge, create pedestrian and cycling-friendly promenades and encourage an economically vibrant area that serves as a destination for locals and visitors alike.

For more information about the project visit: Waterfront Toronto

more information: Queens Quay Opens on Time After Three Years of Revitalization Work

  • West 8 + Snoeck & Partners together with Atelier Roland-Jéol win the competition for the Redevelopment of 't Zand in Bruges

    The City of Bruges has announced West 8 + Snoeck & Partners together with Atelier Roland-Jéol, as the winners of the competition for the redevelopment of the 't Zand, also known as Het Zand Square in the UNESCO town of Bruges, Belgium. Mayor of Bruges and jury member Mr.Renaat Landuyt commented that the winning "plan was revolutionary in its simplicity''. read more

  • First Plans for Old Oak Park, London Released

    Cargiant and their development partners London & Regional Properties have unveiled early plans for the future of their 46-acre site inthe heart of Old Oak Common, London. West 8 together with PLP Architecture, Arup and several other consultants are responsible for the development of the initial plans to transform the site, which are now being launched for consultation. read more

  • Adriaan Geuze exhibits at the Royal Academy of Arts Summer Exhibition 2015

    The 8th of June, 2015 marked the festive public opening of the Summer Exhibition of the Royal Academy of Arts in London. For 247 years this exhibition has showcased the most exciting painting, sculpture, film, architecture and photography from new and established artists. As one of the invited exhibitors in the Architecture Gallery, Adriaan Geuze exhibits with a sculpture titled ’Darwin Accelerated’. read more

  • Holland Green Residential Development moves toward completion

    Work is moving steadily ahead at Holland Green, with the construction of three top-end residential buildings and the surrounding landscape scheduled for completion in October. The renovations to the Grade 2 Heritage listed Parabola Building which will become the new home of the British Design Museum are estimated be finished in late 2016. West 8 has been involved in the landscape architectural design for this multi-phase project since 2008. read more

West 8 urban design & landscape architecture, Schiehaven 13M, 3024 EC Rotterdam, The Netherlands. tel. +31 (0) 10 485 5801, fax. +31 (0) 10 485 6323, public relations: pr@west8.com, general enquiries: west8@west8.com

The information transmitted is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this in error, please contact the sender and delete the material from any computer.

Please consider the environment before you print this message.